Apartment Finishing in Egypt: A Step-by-Step Guide

The correct order of finishing works for an apartment or villa in Egypt, from design and demolition to electrical, plumbing, plastering, flooring, paint and handover.

DECORATION & FINISHING

FUMES Architects Team

11/6/20267 min read

Finished apartment kitchen and living area executed by FUMES Architects
Finished apartment kitchen and living area executed by FUMES Architects

Finishing an apartment is a chain of trades, and each one depends on the one before it. Most delays and extra costs come from doing the right work in the wrong order. This is the sequence we follow when we execute finishing works for our clients.

1. Design and drawings first

Before any worker arrives, you need an approved layout, an electrical and lighting plan, a plumbing plan, ceiling drawings and a materials list. These drawings let you price the work accurately and stop decisions being made on site.

2. Demolition and building works

New partitions are built, openings are adjusted and any walls to be removed are cleared, after checking with a structural engineer. Door and window frames are fixed at this stage.

3. Plumbing and electrical rough-in

Supply and drainage pipes, conduits, sockets, switches and data points are placed according to the drawings. Air-conditioning copper pipes and drains go in now too. Pressure tests on the plumbing are done before anything is covered.

4. Plastering

Walls and ceilings are plastered over the installed services. Straight, well-levelled plaster is the base of good paint, so it is worth checking it carefully.

5. Waterproofing

Bathrooms, the kitchen and balconies are insulated and tested with water before any tiles are laid. This step is hidden but it protects the whole home and the neighbours below.

6. Gypsum ceilings

Gypsum board ceilings and lighting coves are built, leaving openings for lights, AC grilles and maintenance access.

7. Floors and wall cladding

Porcelain, ceramic or marble are installed on floors and walls, starting with the wet areas. We compare the main options in our article porcelain, marble or parquet.

8. Paint, first coats

Putty and primer and the first coats of paint are applied. The final coat waits until the dusty work is finished.

9. Joinery, kitchen and fixtures

Doors, wardrobes, the kitchen, sanitary ware, light fittings, switches and AC units are installed. Parquet, if used, is laid at this stage to protect it from earlier works.

10. Final coat, cleaning and handover

The final paint coat is applied, then a full inspection follows: doors, taps, drains, sockets and lighting are tested and a snag list is closed before handover.

Tips that save money
  • Do not start without complete drawings and a bill of quantities.
  • Approve materials from real samples, and keep them on site for reference.
  • Order long-lead items, such as the kitchen and imported tiles, early.
  • Agree on supervision: someone must check each stage before the next one covers it.

FUMES Architects designs and executes finishing works from our office in New Cairo, and shows the final result in a VR tour before work begins. See our decoration and finishing page, or contact us for a site visit.

Comprehensive solutions in architecture and engineering.

Keep in Touch

info@fumesarchitects.com

+201211036534 (WhatsApp)
+201011036536

© 2026 FUMES Architects Engineering Consultancy. All rights reserved.

EGY